gray and white kitchen
Photo by Sidekix Media on Unsplash

How Long Does a Kitchen Remodel Take?

Kitchen remodels are one of the most common home improvement projects, yet they can take a considerable amount of time. The length of time depends on several factors such as the size and condition of the kitchen, what work needs to be done and how long it takes to obtain materials from manufacturers.

The process of remodeling a kitchen begins with planning and design, where you’ll discuss your requirements with an interior designer or contractor. This will create the blueprint for your new kitchen’s look and help decide on materials to use during construction.

If you’re working with a reliable company, expect to spend at least one month on this stage of the project. Depending on its complexity, you may need to meet with multiple people and gather all your ideas together.

Once your design is approved, it’s time to tear out the old kitchen and prepare for construction on your new one. Protecting the surrounding area from dust and debris during this process also entails moving appliances, furniture, and other items you won’t be using while remodeling is underway.

Once it’s all said and done, you’ll have a beautiful new kitchen. While it may be expensive and take some time to complete, the end results are worth all the effort.

kitchen interior photo
Photo by Im3rd Media on Unsplash

How can you accurately estimate how long it will take to renovate your kitchen?

Once you know your design and estimated cost, you can begin making an estimation for how long the remodel will take. There are various methods to estimate this length but the most popular is using a timeline based on industry standard procedures.

1. Planning and Design – At least one month is necessary for this stage, though it could take longer.

2. Ordering Materials – It can take several weeks to receive all of the building materials necessary for a kitchen remodel, particularly during periods when global shipping delays mean things like windows and appliances may take longer to arrive.

3. Tear-Out and Demolition – The demolition phase can take less than a week, but it could take much longer. During this time, you must take out your existing kitchen as well as any other structural elements that might be in the way.

4. Plumbing and Electrical – Major plumbing and electrical changes can bog down the entire process, so having an experienced plumber and electrician on-hand when this step is completed is highly recommended.

little kitchen island
Photo by Mike Gattorna on Unsplash

5. Finishing – This stage of the kitchen remodel is one of the most rewarding. As contractors install your cabinets, sinks, countertops, flooring and backsplashes you’ll be able to witness the transformation take place.

The amount of time it takes to remodel a kitchen can vary significantly, but on average it takes 8.3 months for planning and 4.5 months for construction. However, actual duration may differ due to any unexpected issues that may crop up along the way.

Site Footer